Documents
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Field density tests for Bituminous macadam |
Accessible Version :
View
(63 KB)
|
|
| Providing 7.5 m clear road width on bridges which are initially designed for 6.8 m clear road width |
Accessible Version :
View
(67 KB)
|
|
| Proper construction of thin bituminous surfacing like surface dressing and premix carpets |
Accessible Version :
View
(71 KB)
|
|
| Construction of Roads on new embankment and in rock cutting |
Accessible Version :
View
(67 KB)
|
|
| Consolidation of metal during the rainy season |
Accessible Version :
View
(11 KB)
|
|
| Introduction of the technique of wet Mix Macadam |
Accessible Version :
View
(117 KB)
|
|
| Construction of water bound macadam road Construction of water bound macadam overlays for strengthening existing road pavements having bituminous surfacing / wearing course |
Accessible Version :
View
(77 KB)
|
|
| Specifications for Hot Mix Laid Bituminous works andMastic Bitumen to State Road Works |
Accessible Version :
View
(68 KB)
|
|
| Use of vibrator road roller for Highways Construction |
Accessible Version :
View
(33 KB)
|
|
| Black topping treatment for Roads |
Accessible Version :
View
(68 KB)
|
|
| Special steps to prevent soil erosion in hilly areas in the context of overall soil conservation measures in the country |
Accessible Version :
View
(71 KB)
|
|
| Unauthorised extraction of Minerals |
Accessible Version :
View
(11 KB)
|
|
| Width of roadway on minor bridges on National Highways |
Accessible Version :
View
(10 KB)
|
|
| Wearing Coat On Bridges |
Accessible Version :
View
(71 KB)
|
|
| Road width on Causeways/Bridges on major district Roads / other district roads / Village roads etc |
Accessible Version :
View
(105 KB)
|
|
| New norms for construction of road over/under bridges in replacement of existing busy level crossings – Criteria for inclusion of such proposals in the works programme |
Accessible Version :
View
(66 KB)
|
|
| Construction of Bridge cum Bandhara type of structure |
Accessible Version :
View
(66 KB)
|
|
| Preparation of detailed proposal for Construction of bridges across S.H./M.S.H./M.D.R. which have been included or proposed to be included in the budget of 95-96 |
Accessible Version :
View
(73 KB)
|
|
| Bridge-cum-Bandhara at the proposed sites for bridges and Kolhapur type of weirs in the State |
Accessible Version :
View
(73 KB)
|
|
| Approval to the plans and estimates of Canal Road Crossings |
Accessible Version :
View
(68 KB)
|
|
| Wearing Coat on Bridges |
Accessible Version :
View
(71 KB)
|
|
| Road width on Causeways/Bridges on major district Roads / other district roads/Village roads etc |
Accessible Version :
View
(105 KB)
|
|
| New norms for construction of road over/under bridges in replacement of existing busy level crossings – Criteria for inclusion of such proposals in the works programme |
Accessible Version :
View
(61 KB)
|
|
| Width of roadway on minor bridges on National Highways |
Accessible Version :
View
(10 KB)
|
|
| Construction of Bridge Cum Bandhara type of structure |
Accessible Version :
View
(13 KB)
|
|
| Preparation of detailed proposal for Construction of bridges across S.H./M.S.H./M.D.R. which have been included or proposed to be included in the budget of 95-96 |
Accessible Version :
View
(66 KB)
|
|
| Bridge-cum-Bandhara at the proposed sites for bridges and Kolhapur type of weirs in the State |
Accessible Version :
View
(73 KB)
|
|
| Approval to the plans and estimates of Canal Road Crossings |
Accessible Version :
View
(68 KB)
|
|
| Work executed departmentally procedure to be followed for grant of quarry permission |
Accessible Version :
View
(72 KB)
|
|
| Unauthorised extraction of Minerals |
Accessible Version :
View
(11 KB)
|