Documents
Filter Document category wise
Title | Date | View / Download |
---|---|---|
Clearing the Vent way of Causeways and assuring good condition of Parapet walls for the Bridges before Monsoon |
Accessible Version :
View
(101 KB) /
|
|
Display Boards on all the Works taken up under Central Roads Funds |
Accessible Version :
View
(308 KB) /
|
|
Inspection of Bridges and CD Works and its timely maintenance |
Accessible Version :
View
(58 KB) /
|
|
Precautionary measures to be taken during the Widening and Metaling of Existing Roads |
Accessible Version :
View
(73 KB) /
|
|
Precautionary measures to be taken during preparation of proposal for Widening of Roads and its Strengthening and maintaining of a Register for the thickness of Road Metal |
Accessible Version :
View
(182 KB) /
|
|
Bridge inspection |
Accessible Version :
View
(205 KB) /
|
|
Building line and Control line rules |
Accessible Version :
View
(229 KB) /
|
|
Bank Guarantee for Petrol / Diesel errection |
Accessible Version :
View
(337 KB) /
|
|
Employment Guarantee Scheme |
Accessible Version :
View
(752 KB) /
|
|
Road Crossing permission for pipe line |
Accessible Version :
View
(482 KB) /
|
|
Road Maintenance |
Accessible Version :
View
(60 KB) /
|
|
Blacktopping of Tribal Area Roads |
Accessible Version :
View
(92 KB) /
|
|
Erecting of Statue on PWD Maintained Roads |
Accessible Version :
View
(369 KB) /
|
|
Supply of elastomeric bearings for bridges on NH and other Centrally Sponsored Schemes |
Accessible Version :
View
(70 KB) /
|
|
Providing 7.5 m clear road width on bridges which are initially designed for 6.8 m clear road width |
Accessible Version :
View
(67 KB) /
|
|
Economy in Road Planning and Road Construction |
Accessible Version :
View
(108 KB) /
|
|
Field density tests for Bituminous macadam |
Accessible Version :
View
(63 KB) /
|
|
Providing 7.5 m clear road width on bridges which are initially designed for 6.8 m clear road width |
Accessible Version :
View
(67 KB) /
|
|
Proper construction of thin bituminous surfacing like surface dressing and premix carpets |
Accessible Version :
View
(71 KB) /
|
|
Construction of Roads on new embankment and in rock cutting |
Accessible Version :
View
(67 KB) /
|
|
Consolidation of metal during the rainy season |
Accessible Version :
View
(11 KB) /
|
|
Introduction of the technique of wet Mix Macadam |
Accessible Version :
View
(117 KB) /
|
|
Construction of water bound macadam road Construction of water bound macadam overlays for strengthening existing road pavements having bituminous surfacing / wearing course |
Accessible Version :
View
(77 KB) /
|
|
Specifications for Hot Mix Laid Bituminous works andMastic Bitumen to State Road Works |
Accessible Version :
View
(68 KB) /
|
|
Use of vibrator road roller for Highways Construction |
Accessible Version :
View
(33 KB) /
|
|
Black topping treatment for Roads |
Accessible Version :
View
(68 KB) /
|
|
Special steps to prevent soil erosion in hilly areas in the context of overall soil conservation measures in the country |
Accessible Version :
View
(71 KB) /
|
|
Unauthorised extraction of Minerals |
Accessible Version :
View
(11 KB) /
|
|
Width of roadway on minor bridges on National Highways |
Accessible Version :
View
(10 KB) /
|
|
Wearing Coat On Bridges |
Accessible Version :
View
(71 KB) /
|