Documents
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Verification of Documents attached along with the Registration of Contractors Proposals |
Accessible Version :
View
(196 KB)
|
|
| Revised rules for Registration of Contractors – providing concessions to Unemployed Electrical Engineers |
Accessible Version :
View
(86 KB)
|
|
| Awarding of Works to Unemployed Engineers |
Accessible Version :
View
(174 KB)
|
|
| Awarding of Works to Unemployed Engineers |
Accessible Version :
View
(142 KB)
|
|
| Provision of Post Qualification Criteria in B-1 Tenders |
Accessible Version :
View
(147 KB)
|
|
| Submission of ‘Joint Venture’ tenders by Two or More Registered Contractors |
Accessible Version :
View
(364 KB)
|
|
| Registration of Interior Designer Agencies Registration |
Accessible Version :
View
(364 KB)
|
|
| Improvements to Clause 36 of B-1 Tender Form ‘C’ regarding refund of Royalty charges from Contractors |
Accessible Version :
View
(185 KB)
|
|
| Awarding of Works to Unemployed Engineers |
Accessible Version :
View
(196 KB)
|
|
| Providing concessions to Unemployed Service Organizations and Public Service Centers |
Accessible Version :
View
(279 KB)
|
|
| Revised rules for Registration Of Contractors |
Accessible Version :
View
(2 MB)
|
|
| Renewal of Registration for Civil and Electrical Unemployed Engineers |
Accessible Version :
View
(178 KB)
|
|
| Splitting Of Works |
Accessible Version :
View
(81 KB)
|
|
| Reconstitution of Bridge Inspection Committee |
Accessible Version :
View
(109 KB)
|
|
| Clearing the Vent way of Causeways and assuring good condition of Parapet walls for the Bridges before Monsoon |
Accessible Version :
View
(101 KB)
|
|
| Display Boards on all the Works taken up under Central Roads Funds |
Accessible Version :
View
(308 KB)
|
|
| Inspection of Bridges and CD Works and its timely maintenance |
Accessible Version :
View
(58 KB)
|
|
| Precautionary measures to be taken during the Widening and Metaling of Existing Roads |
Accessible Version :
View
(73 KB)
|
|
| Precautionary measures to be taken during preparation of proposal for Widening of Roads and its Strengthening and maintaining of a Register for the thickness of Road Metal |
Accessible Version :
View
(182 KB)
|
|
| Bridge inspection |
Accessible Version :
View
(205 KB)
|
|
| Building line and Control line rules |
Accessible Version :
View
(229 KB)
|
|
| Bank Guarantee for Petrol / Diesel errection |
Accessible Version :
View
(337 KB)
|
|
| Employment Guarantee Scheme |
Accessible Version :
View
(752 KB)
|
|
| Road Crossing permission for pipe line |
Accessible Version :
View
(482 KB)
|
|
| Road Maintenance |
Accessible Version :
View
(60 KB)
|
|
| Blacktopping of Tribal Area Roads |
Accessible Version :
View
(92 KB)
|
|
| Erecting of Statue on PWD Maintained Roads |
Accessible Version :
View
(369 KB)
|
|
| Supply of elastomeric bearings for bridges on NH and other Centrally Sponsored Schemes |
Accessible Version :
View
(70 KB)
|
|
| Providing 7.5 m clear road width on bridges which are initially designed for 6.8 m clear road width |
Accessible Version :
View
(67 KB)
|
|
| Economy in Road Planning and Road Construction |
Accessible Version :
View
(108 KB)
|