Close

    NABARD Success Stories

     

     

    NABARD Success Stories
    Sr.No. PW Circle Name Description View/download
    1 Ratnagiri NABARD Success Story – Chiplun (Khed Taluka) Construction of a major bridge at Khed Taluka under NABARD-25, replacing a low-level crossing and ensuring safe, uninterrupted all-weather connectivity for rural and tribal habitations. View
    2 Sindhudurg NABARD Success Story – Kankavali Construction of a minor bridge under NABARD assistance at Kankavali, restoring year-round connectivity, preventing monsoon isolation, and improving access to markets, schools, and healthcare. View
    3 Ahmednagar NABARD Success Story – Shevgaon Dhora River Bridge Construction of an arch causeway across the Dhora River under NABARD-28, ensuring durable, low-cost all-weather connectivity and supporting agriculture, education, and rural mobility. View
    4 Ratnagiri NABARD Success Story – North Ratnagiri Bridges Construction of multiple bridges in North Ratnagiri under NABARD schemes, connecting remote villages to state highways and enabling reliable year-round transportation and economic activity. View
    5 Amravati NABARD Success Story – Kharawadi Bridge (SH-298) Construction of a bridge at Km 6.600 on SH-298 under NABARD, eliminating flood-related disruptions and improving connectivity between Chandur Bazar and surrounding villages. View
    6 Nandurbar NABARD Success Story – Amravati River Bridge (Talwade) Construction of a major bridge over the Amravati River under NABARD-28, resolving long-standing connectivity issues and benefiting over 13,000 rural and tribal residents. View
    7 Sindhudurg NABARD Success Story – Hewale Bridge, Sawantwadi Construction of a 70 m long major bridge under NABARD-25, connecting remote villages to Sawantwadi taluka and ensuring safe, uninterrupted connectivity. View
    8 Satara NABARD Success Story – Urmodi River Bridge, Shelkewadi Construction of a high-level major bridge under NABARD-27, reducing travel time by 50% and ensuring safe monsoon connectivity. View
    9 Raigad NABARD Success Story – Birwadi Bridge (SH-102) Construction of a major bridge on SH-102, eliminating monsoon isolation and providing safe, year-round connectivity to Mahad and surrounding villages. View
    10 Solapur NABARD Success Story – Khawaspur Bridge (Man River) Construction of a major bridge under NABARD-28, reducing travel time by 70% and improving access to sugar factories, healthcare, and markets. View
    11 Solapur NABARD Success Story – Bavachi Bridge, Mangalwedha Construction of a high-level bridge under NABARD-29, eliminating monsoon disruptions and ensuring safe, year-round rural connectivity. View
    12 Solapur NABARD Success Story – SH-213 Bridge at Km 16.500 Construction of a major bridge on SH-213, improving traffic safety, reducing travel time, and strengthening rural connectivity in Malshiras taluka. View
    13 Akola NABARD Success Story – SH-284 Minor Bridge at Km 6.600 (Murtijapur) Construction of a 24.60 m long minor bridge including approaches at Km 6.600 on Murtijapur–Chikhali–Gajipur–Palso–Badhe–Akola Road (SH-284) under NABARD-29, ensuring year-round connectivity, reducing monsoon-related traffic disruption, and facilitating smooth transport of agricultural produce. View
    14 Akola NABARD Success Story – SH-284 Minor Bridge at Km 8.000 (Murtijapur) Construction of an 18.00 m long minor bridge including approaches at Km 8.000 on Murtijapur–Chikhali–Gajipur–Palso–Badhe–Akola Road (SH-284) under NABARD-29, eliminating waterlogging issues, restoring safe all-weather access, and supporting farmers, students, and daily commuters. View
    15 Akola NABARD Success Story – Paturda–Ukali–Panchagavan–Ner–Nanakhed Road Bridge Construction of a modern RCC box-cell bridge on SH-278 (Km 41/400) under NABARD (RIDF), connecting Akola and Buldhana districts, preventing monsoon isolation, improving emergency access, and enabling uninterrupted trade, education, and healthcare services. View
    16 Solapur NABARD Success Story – Khawaspur Bridge on Man River (ODR-93) Construction of a 165 m long major bridge across the Man River near Khawaspur under NABARD-28, reducing travel time by nearly 70%, ensuring safe monsoon crossings, and significantly improving access to sugar factories, markets, healthcare, and regional economic activity. View
    17 Amravati NABARD Success Story – MDR-73 Bridge at Mangruli (Warud) Construction of a minor bridge on Major District Road MDR-73 across the Shakti River at Mangruli village under NABARD assistance, replacing a low-level causeway and ensuring uninterrupted all-weather connectivity, improving agricultural transport, school access, and daily commuting to Warud market. View
    18 Amravati NABARD Success Story – MDR-93 Bridge at Mangruli (Warud) Construction of a 30 m long minor bridge on MDR-93 (Nagziri–Goregaon–Peth Mangruli–Amdapur Road) under NABARD-29, eliminating monsoon isolation, reducing detours by 16 km, and facilitating safe movement of agricultural produce, students, and daily commuters. View
    19 Gadchiroli NABARD Success Story – Karemarka Bridge-cum-Bandhara (VR-136) Construction of a 60 m long high-level submersible bridge-cum-bandhara on Karemarka Approach Road (VR-136) under NABARD-23, restoring critical tribal and naxalite-area connectivity, improving access to NH-930, and enabling post-monsoon water storage for local use. View
    20 Gadchiroli NABARD Success Story – Tulsi–Potgaon Minor Bridge (VR-39) Construction of a 21.18 m long minor bridge with precast M-50 arches on Tulsi–Potgaon Road (VR-39) under NABARD-23, eliminating seasonal isolation and strengthening rural and tribal connectivity in Wadsa taluka. View
    21 Gadchiroli NABARD Success Story – Godalwahi–Kasansur Road Bridge (MDR-12) Construction of a 60 m long high-level bridge across Kandoli Nallah on MDR-12 under NABARD-23, restoring connectivity to SH-380 and Chhattisgarh state, reducing travel time by 80%, and ensuring safe year-round movement in Etapalli taluka. View
    22 Ahmednagar NABARD Success Story – Mhaisgaon Bridge on SH-36 (Rahuri) Construction of a 24 m long minor bridge on Shrirampur–Deolali–Mhaisgaon Road (SH-36) at Km 79/200 under NABARD-27, replacing a flood-prone low-level crossing and ensuring uninterrupted transport of milk, sugarcane, agricultural produce, and daily commuters. View
    23 Gadchiroli NABARD Success Story – Kurkheda–Moushi Minor Bridge (MDR-46) Construction of an 18 m long minor bridge at Km 7/300 on MDR-46 under NABARD-28, connecting villages to NH-543, eliminating monsoon disruptions, reducing travel time by 80%, and improving access to markets, education, and healthcare in Kurkheda taluka. View
    24 Ahmednagar NABARD Success Story – Shevgaon (Dhora River Bridge, SH-52) Construction of a major arch causeway across the Dhora River on SH-52 under NABARD-28, providing safe, durable, all-weather connectivity for agricultural transport, students, and rural commuters in Shevgaon taluka. View
    25 Akola NABARD Success Story – Kondoli Bridge (ODR-70, Arunavati River) Construction of a high-level submersible major bridge on Amgavhan–Kondoli–Bhoini Fata Road under NABARD-28, restoring year-round connectivity and replacing a damaged causeway prone to monsoon disruption. View
    26 Buldhana NABARD Success Story – Chikhli Minor Bridge (MDR-132) Construction of a minor bridge on NH-753(A) to Yelgaon–Sakhali–Sawargaon road at MDR-132 under NABARD assistance, eliminating monsoon isolation and improving access to agriculture, education, and healthcare. View
    27 Satara NABARD Success Story – Amble Major Bridge (Tarali River) Construction of a high-level major bridge across the Tarali River near Amble village under NABARD-24, replacing a risky pipe causeway and significantly reducing travel time while ensuring safe monsoon connectivity. View
    28 Palghar NABARD Success Story – Kelthan–Dakivali Road Improvement (MDR-42) Improvement of Kelthan–Dakivali Road from Km 30/000 to 31/200 under NABARD-29, creating durable all-weather road infrastructure and enhancing connectivity for tribal villages, farmers, and students. View
    29 Amravati NABARD Success Story – Kharwadi Bridge on SH-298 (Chandur Bazar) Construction of a 23.30 m long submersible minor bridge at Km 6/600 on Chandur Bazar–Walgaon–Kamunj–Kud Road (SH-298) near Kharwadi village under NABARD-29, replacing a narrow low-lying structure and ensuring safe, uninterrupted all-weather connectivity for over 7,600 residents across Kharwadi, Kharala, and Jawla Shahapur villages. View
    30 Thane NABARD Success Story – Waklan Minor Bridge (VR-46) Construction of a minor bridge at Km 4/100 on Dahisar–Nighu–Waklan Road (VR-46) under NABARD-28, resolving chronic monsoon flooding, restoring year-round connectivity, and integrating isolated rural pockets of Waklan with Thane and Kalyan urban centers. View
    31 Dhule NABARD Success Story – Sutarwadi Bridge on Kan River (Amali) Construction of a major bridge across the Kan River at Sutarwadi–Amali Road under NABARD assistance, replacing a damaged causeway and ensuring safe all-weather connectivity for farmers, students, devotees, and local residents while strengthening rural mobility and regional economic activity. View
    32 Nandurbar NABARD Success Story – Amravati River Bridge at Talwade (PR-52) Construction of a major bridge at Km 12/850 on PR-52 near Talwade village under NABARD-28, replacing an old submersible crossing over the Amravati River and ensuring uninterrupted all-weather connectivity for rural residents, students, farmers, and emergency services in Nandurbar taluka. View
    33 Satara NABARD Success Story – Amble Major Bridge on Tarali River (ODR-52) Construction of a 118.77 m long high-level major bridge across the Tarali River near Amble village under NABARD-24, replacing a dangerous pipe causeway and significantly reducing travel time while ensuring safe year-round connectivity for villages in Patan taluka. View
    34 Raigad NABARD Success Story – Birwadi Major Bridge on SH-102 Construction of a major bridge on Birwadi–Walan–Sandoshi Road (SH-102) under NABARD assistance, eliminating monsoon isolation, improving traffic safety, and strengthening connectivity between Mahad taluka villages and key markets, healthcare, and education centers. View
    35 Satara NABARD Success Story – Dhom Major Bridge on Krishna River (VR-206) Construction of a 93.94 m long major bridge with approach roads near Dhom Dam under NABARD-25, replacing a flood-prone causeway and improving safe connectivity between villages in Wai taluka while reducing travel time and enhancing access to markets and healthcare. View
    36 Solapur NABARD Success Story – Khawaspur Major Bridge on Man River (ODR-93) Construction of a 165 m long low-level major bridge across the Man River near Khawaspur village under NABARD-28, ensuring safe monsoon connectivity, reducing travel distance by 70%, and improving access to sugar factories, markets, and healthcare facilities. View
    37 Gadchiroli NABARD Success Story – Asarali–Somnoor Minor Bridge (VR-109) Construction of a 40 m long minor bridge on Asarali–Somnoor Road (VR-109) under NABARD-23, replacing a submerged KT weir and restoring safe all-weather connectivity for farmers, students, and residents of Sironcha taluka. View
    38 Chandrapur NABARD Success Story – Vihirgaon Major Bridge on MDR-16 (Rajura) Construction of a 50 m long non-submersible major bridge near Vihirgaon village under NABARD-26, addressing flood-related traffic disruption caused by Wardha River backwaters and ensuring year-round access to healthcare, education, and markets in Rajura taluka. View
    39 Solapur NABARD Success Story – Bavachi High-Level Bridge on MDR-73 Construction of a 70 m long high-level submersible bridge across the Shirnandagi River near Bavachi village under NABARD-29, eliminating seasonal isolation, improving road safety, and supporting agricultural transport and daily commuting in Mangalwedha taluka. View
    40 Ahmednagar NABARD Success Story – Mhaisgaon Minor Bridge on SH-36 (Rahuri) Construction of a 24 m long minor bridge at Km 79/200 on SH-36 under NABARD-27, replacing a flood-prone low-level CD work and ensuring uninterrupted movement of milk, sugarcane, agricultural produce, and daily commuters in Rahuri taluka. View
    41 Nanded NABARD Success Story – Sangavi Kh. Major Bridge on MDR-100 (Ardhapur) Construction of a 37.03 m long high-level major bridge on Sangavi–Ardhapur Road (MDR-100) at Km 11/200 under NABARD assistance, replacing an unsafe river crossing and ensuring reliable all-weather connectivity for Sangavi Kh. village, farmers, students, and daily commuters to Ardhapur city. View
    42 Nanded NABARD Success Story – Shiradhon Bridge on NH-161A (VR-107) Construction of a 22 m long minor submersible bridge with approaches on NH-161A at Shiradhon village under NABARD-27, replacing a frequently submerged causeway and restoring safe, uninterrupted connectivity for Shiradhon, Bhutyachiwadi, and Alegaon villages to markets, schools, and healthcare facilities. View
    43 Solapur NABARD Success Story – Vakav Major Bridge on Sina River (VR-71 / VR-72) Construction of a 30 m long high-level major bridge across the Sina River at Vakav village under NABARD assistance, replacing a flood-prone earthen crossing and ensuring safe year-round connectivity between Vakav, Undargaon, Chavanwadi, and surrounding villages. View
    44 Raigad NABARD Success Story – Tarankhop Bridge-cum-Bandhara on Bhogavati River (ODR-56) Construction of a 100 m long major bridge-cum-bandhara on Bhogavati River at Tarankhop–Borgaon Road (ODR-56) under NABARD-28, enabling two-way traffic, reducing travel distance, improving irrigation water availability, and ensuring safe all-weather connectivity in Pen taluka. View