Circular / Periodic Returns-Civil (Estimation)
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Width of roadway on minor bridges on National Highways |
Accessible Version :
View(10 KB)
|
|
| Wearing Coat On Bridges |
Accessible Version :
View(71 KB)
|
|
| Road width on Causeways/Bridges on major district Roads / other district roads / Village roads etc |
Accessible Version :
View(105 KB)
|
|
| New norms for construction of road over/under bridges in replacement of existing busy level crossings – Criteria for inclusion of such proposals in the works programme |
Accessible Version :
View(66 KB)
|
|
| Construction of Bridge cum Bandhara type of structure |
Accessible Version :
View(66 KB)
|
|
| Preparation of detailed proposal for Construction of bridges across S.H./M.S.H./M.D.R. which have been included or proposed to be included in the budget of 95-96 |
Accessible Version :
View(73 KB)
|
|
| Bridge-cum-Bandhara at the proposed sites for bridges and Kolhapur type of weirs in the State |
Accessible Version :
View(73 KB)
|
|
| Approval to the plans and estimates of Canal Road Crossings |
Accessible Version :
View(68 KB)
|
|
| Wearing Coat on Bridges |
Accessible Version :
View(71 KB)
|
|
| Road width on Causeways/Bridges on major district Roads / other district roads/Village roads etc |
Accessible Version :
View(105 KB)
|
|
| New norms for construction of road over/under bridges in replacement of existing busy level crossings – Criteria for inclusion of such proposals in the works programme |
Accessible Version :
View(61 KB)
|
|
| Width of roadway on minor bridges on National Highways |
Accessible Version :
View(10 KB)
|
|
| Construction of Bridge Cum Bandhara type of structure |
Accessible Version :
View(13 KB)
|
|
| Preparation of detailed proposal for Construction of bridges across S.H./M.S.H./M.D.R. which have been included or proposed to be included in the budget of 95-96 |
Accessible Version :
View(66 KB)
|
|
| Bridge-cum-Bandhara at the proposed sites for bridges and Kolhapur type of weirs in the State |
Accessible Version :
View(73 KB)
|
|
| Approval to the plans and estimates of Canal Road Crossings |
Accessible Version :
View(68 KB)
|
|
| Work executed departmentally procedure to be followed for grant of quarry permission |
Accessible Version :
View(72 KB)
|
|
| Unauthorised extraction of Minerals |
Accessible Version :
View(11 KB)
|
|
| Use of Hot Mix Plants on National Highway works Technical Specifications |
Accessible Version :
View(12 KB)
|
|
| Widening and black topping of roads |
Accessible Version :
View(60 KB)
|
|
| Carriageway widths on bridges and culverts across canals and distributaries on National Highways or State Roads |
Accessible Version :
View(75 KB)
|
|
| Black Topping of Roads,Crust thickness and Drainage |
Accessible Version :
View(11 KB)
|
|
| Provision of paved shoulders on National Highways |
Accessible Version :
View(22 KB)
|
|
| Co-ordination of road works and Irrigation works affected by Irrigation projects |
Accessible Version :
View(78 KB)
|
|
| Width of roadway on Minor Bridges on National Highways |
Accessible Version :
View(70 KB)
|
|
| Black topping treatment for roads having traffic intensity more than 3000 MT / day -Use of Hot mix plants and paver finisher |
Accessible Version :
View(12 KB)
|
|
| Restricting the width of carriageway of the roads in Sugar Factory Areas |
Accessible Version :
View(67 KB)
|
|
| Approval to the alignment of Roads -Delegation of enhanced powers |
Accessible Version :
View(68 KB)
|
|
| Approval to the plans and estimates of canal road crossing |
Accessible Version :
View(76 KB)
|